Skip to main content Site Map
Report a Water Leak

WHAT's New In Wastewater:

 – By


In November, the Wastewater Department has been working on cleanups from the past few water breaks and Veteran’s Park lift station repairs/system upgrades. This upgrade includes the installation of a new backup electrical generator. This new generator will provide the wastewater lift station with the power needed to remain running in the event of a storm or any other disruption of service.



Last Modified:

TOP